PLC, HMI, commissioning, and technical delivery

Industrial automation for lines, conveyors, and production upgrades

PLC programming, HMI, frequency drives, electrical design, and commissioning support for projects where control, equipment, and documentation need to work as one system.

Shatilov Engineering works on projects in Germany and across Europe: from upgrades and dismantling of existing sections to the launch of new lines, equipment commissioning, and preparation of technical documentation.

Projects at Audi, VW, Mercedes, and other industrial sitesWork with Siemens, SEW, and equipment from other manufacturersExperience in DÜRR and Blumenbecker projects, new lines, and modernization work
Industrial line with automated equipment

A project fragment after commissioning and equipment tuning.

Equipment detail in a live production environment

A project environment where signal logic, interfaces, and precision matter.

Main areas of work

The main focus is industrial automation and documentation for real production tasks: where PLCs, HMIs, drives, schematics, and commissioning support are needed without unnecessary theory.

PLC, HMI, and commissioning

When control logic, operator interfaces, signals, and equipment startup need to be brought together into one stable working system.

Where the task appears
  • PLC logic needs to be revised, expanded, or built from scratch
  • HMI, signals, and peripheral devices are not working consistently together
  • Direct technical support is missing before startup or during commissioning
What is taken on
  • PLC and HMI programming for the needs of the specific project
  • Checking logic, signals, interfaces, and operating sequences
  • Bringing the system to stable operation
Format

Project block / Joining an existing project / Support during commissioning

Discuss a PLC task

Electrical schematics and working documentation

When electrical schematics and project documentation need to reflect the real state of the project instead of lagging behind operational changes.

Where the task appears
  • Project changes are not making their way into schematics and documentation fast enough
  • Templates, structure, and naming are not aligned into one usable working standard
  • Handing documentation over becomes inconvenient for assembly, commissioning, and service
What is taken on
  • Creation and revision of electrical schematics
  • Updating documentation to match real project changes
  • Preparing a clear documentation package for production, installation, and further work
Format

Project support / Documentation updates / Preparation for handover

Discuss project documentation

Simulation, practical tools, and integrations for the project

These tasks are added where they genuinely help the project: for debugging logic, checking signals, creating supporting applications, and simplifying internal workflows.

Additional support

Signal and equipment behavior simulation

When a PLC program needs to be debugged locally on a computer or laptop before real equipment is connected and without using an additional test bench.

  • Simulation of sensors, actuators, and standard operating signals
  • Local PLC program debugging on a computer or laptop

Local debugging / Preparation for startup / Logic verification support

Discuss simulation

Additional support

Internal tools and integrations

When a project needs more than PLC work and documentation, and also requires supporting tools for debugging, signal checking, and engineering work with data.

  • Small practical project tools, including tools built in C#
  • Supporting interfaces and working utilities for the engineering team

Focused task / Pilot version / Further development as needed

Discuss an engineering tool

Additional support

Technical support and project structure

When the technical entry point into a project, the priorities, and the sequence of real steps need to be clarified before the work begins.

  • Technical assessment of the current situation
  • Definition of the first priority steps

Initial review / Planning / Ongoing support

Discuss project kickoff

First contact

Discuss an industrial automation task

If PLC logic needs refinement, a line needs to be launched, drives need tuning, documentation needs to be cleaned up, or support is required during commissioning, a short first conversation usually shows the next practical step very quickly.